Arden Middle School
The new campus replaces the original campus built in 1938 and utilizes the similar two-story design concept that was introduced for Dyer-Kelly Elementary School but was modified to fit the needs of the middle school programs and students. The 82,970 square foot replacement campus consists of science, arts, maker spaces, as well as general classrooms equipped with NextGEN, flexible spaces. Additionally, there is a new building that incorporates locker rooms, band and choral space, as well as a physical education classroom.