UCI Health B23 Linear Accelerator Replacement

The project entails replacing a failing Acuity Linear Accelerator (LinAc) and outdated High Dose Rate (HDR) system on the first level of the OSHPD-3 Cancer Center with new Ethos Linac and Bravos HDR. A comprehensive review of the as-built plans in close collaboration with Varian defined the scope of work. This includes refreshing floor finishes, removing the existing wall-mounted laser positioning devices and replacing the old power conditioner. Additionally, the roof-mounted chiller on the fourth level was replaced with a smaller, more efficient unit, along with the installation of a new backup water changeover system and pump, housed in a new exterior enclosure.